A) KAFZA-II FOR OIL STORGE TERMINAL / EPC PROJECT.
Client : SKA Energy Holding Co. Ltd.
Project Name : Oil Storage Terminal_ KafzaII
Sub-Contractor : Al-Fayha Precast Company Ltd
Date of Contract : 10th June. 2015
Completion Date : 10th Dec. 2015
Location : Khor Al-Zubair, Al-Basra, Iraq At Free zone
Scope of Work : Procurements & Construction Of Cast in Situ Pile Foundation For Storage
Tanks at Kafza-II, Iraq
.....................................................................................................................
.jpg)
B) Al-Zubair Electrical Power Station Project:
Client : Ministry of Electricity
Main Contractor : SHAMS Al-SABAH Co. Ltd
Sub-Contractor : Al-FAYHA PRECAST Co. Ltd.
Contract Date : 8th Jan., 2015
Completion Date : 26th April; 2015
Location : Al-Basra – Al-Rumaila
Scope of Work : Manufacturing of Precast T-walls to Supply (3,500 Pieces), for Security Fence.
......................................................................................................................
.jpg)
C) China Geo-Engineering Ltd. / CGC IN IRAQ
Client : Ministry of Oil.
Main Contractor : Nature Gas Plant Project in Missan
Sub-Contractor : Al-Fayha Precast Company Ltd
Date of Contract : 10th May, 2015
Completion Date : 20th June, 2015
Location : Missan-Iraq
Scope of Work : Manufacturing, Transportation and Installation of Precast Piles.


..................................................................................................................
D ) Iraq Crude Oil Export & Expansion Project (ICOEEP) at Fao Island:
Client : South Oil Company (SOC)
Consultant : Foster Wheeler
Main Contractor : Leighton Offshore
Sub-Contractor : Una E&C
Completion Date : 30th June 2012
Location : Al-Fao Island
Type of Work : Civil Works
Scope : Beach Valve Station (BVS) & Al-Fao Station (Pipeline Works at Fao)
This Project is part of the Crude Oil Export Pipe Lines Expansion at Al-Fao. The Project is divided into two Phases: (Phase-I & Phase-II).

CIVIL WORKS FOR BVS :-
· Earth Works: -
- Site Clearance and preparation;
- Site stripping, grading & leveling;
- Cutting/Filling & Compaction;
- Dispose of Surplus Materials; Road Access: -
- Cutting & Filling, Road Marking, Traffic Signs;
- Precast Kerbstone impeded on 20mm thickness;
- Other Civil Works: -
- Surface & Drainage; Berm & Surface;
- Fence Works; Gate works & Lighting;
- Sub-Station, Piling, Gate Valve Foundation;
- Pipe Supports, Access Platform; HPU Cabinet Shelter; Protection.
· CIVIL WORKS FOR FAO SUB-STATION:
· Earth Works: -
- Site Clearance and preparation;
- Site stripping, grading & leveling;
- Cutting/Filling & Compaction;
- Dispose of Surplus Materials;
· Road Access: -
- Cutting & Filling;
- Road Marking, Traffic Signs;
- Precast Kerbstone impeded on 20mm thickness.
· Other Civil Works: -
- Surface & Drainage;
- Berm & Surface;
- Fence Works; Gate works & Lighting
- Sub-Station, Gate Valve Foundation;
- Pipe Supports, Piling, Road Crossing;
- HPU Cabinet Shelter; Access Platform, Protection &Trenching.
· Foundation Woks:-
- Metering Skid Foundation;
- Metering Skid Shelter Foundation;
- Metering Skid Installation;
- Diesel Power Generator Foundation;
- Pig Launcher & Receiver Pad;
- Transformer Foundation;
- Vent Stack Foundation;
- Instrument Air System;
- Sampling System Foundation.

.............................................................................................
D) Shat Al-Arab Hotel Construction at Shat Al-Arab River (Presidential Palace
Client : Basra Governorate
Main Contractor : Shapoorji Pallonji Mid-East Co.
Sub-Contractor : Al-Fayha Precast Company Ltd
Completion Date :
Location : Shatt Al-Arab
Type of Work : Design & Built (Turn Key), Shatt Al-Arab Hotel Project
Scope : Test, Supply & Installation of Precast Piles.
Al-Fayha is Subcontractor for the execution of Test, Supply and Installation of Precast Piles for the hotel.
The Test of Piles was executed by Al-Fayha through its Subsidiary Co. Al-Watania for Engineering and Contracting Co. Ltd.
Pile Tests include; (PDA, Compression, Tension and Lateral Tests), of which Certified Reports are issued.
...................................................................
.jpg)
F) WQ - 2 DEVELOPMENT PROJECT :
Client : LukOil Mid-East Co. Ltd
Consultant :
Main Contractor : Samsung Engineering Co. Ltd
Sub-Contractor : Al-Fayha Precast Company Ltd
Contract Date : 4th April 2012
Completion Date : 25th March 2013
Location : SWQ-2
Type of Work : Commercial Production of 400KBPD at WQ- II
Scope : Test, Supply & Installation of Precast Piles
in this Project, due to excellent performance of the Project, Al-Fayha was awarded Certificate of Appreciation.
Please refer in the appendix of the Awarded Certificates.
..................................................................
.jpg)
H) CONSTRUCTION OF POWER PLANT PROJECT AT WQ- 2:
Client : LukOil Mid-East Co. Ltd
Main Contractor : ENKA Insaat Ve Sanayi A.S
Sub-Contractor : Al-Fayha Precast Company Ltd
Date of Contract : 31st May 2012
Completion Date : 30th March 2013
Location : WQ-2
Type of Work : EPC of 3 X 42MW GTPP
Scope : Test, Supply & Installation of Precast Concrete Piles.
 |
.............................................................................
.jpg)
I) AL- Najybia 4x125MW 9E GE Gas Turbine Power Plant Project:
Client : Ministry of Electricity
Main Contractor : ENKA TEKNIK for General Contracting & Maintenance
Sub-Contractor : Al-Fayha Precast Company Ltd
Date of Contract : 5th February 2013
Completion Date :
Location : Al-Najybia Power Plant Project
Type of Work : 4 x125MW 9E GE Gas Turbine
Scope : Supply & Installation of Precast Fence.